Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 234 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
The completion of the previously permitted solar farm development (planning ref no. 16/4601) with minor changes to the dimensions of the previously permitted photovoltaic panels and ground mounted array layout, 1 transformer station, 1 storage unit and 1 delivery station in addition to security fencing, CCTV and all associated ancillary development works within a site area of 12.23 hectares. All works will be completed with in the previously assessed site boundary under planning ref. no. 16/4601 at Dromalour, Coolclogh, Kanturk, Co.Cork. A Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the planning authority.
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 12.23 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works - Extension of Duration to Permission granted under Planning Ref. No. 16/4601
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 12.23 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works. Extension of Duration to Permission granted under Planning Ref. No. 16/4601
Permission to (a) Construct a new extension to southern elevation and a new extension to western and northern elevation, all to existing dwelling house, (b) Install a new window and replace existing door/window with a new door with sidelights to existing rear extension and (c) Decommission existing wastewater treatment system and install a new wastewater treatment system, polishing filter, and all associated site works.
Construction of a dwelling, domestic garage and all associated site works.
(1)Construction of a warehouse to be used for storage purposes which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter,(4) construction of concrete pavements around new building and (5) all associated site works.
The brief summarizes the pattern across all 234 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/6224The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief