Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 196 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
1.Continuance of use of the existing permitted quarry site and all existing ancillary site and welfare facilities, storage areas, and provision for crushing and screening of unsuitable dimension stone rock, authorised by the previous grants of planning permissions P. Ref. 04/1867 (which superseded P. Ref. P538/96) and P. Ref 16/474, which are due to expire on the 1 January 2025; 2. Lateral extension of the existing quarry void by c. 5.3 hectares to give an overall quarry footprint of c. 9.3 hectares. The final extraction depth will be c. 56m AOD similar to the existing quarry floor level permitted by P. Ref. 04/1867; 3.Provision of screening berms to proposed quarry extension boundary; 4.Provision of a new site maintenance shed (c.10m x 16m = 160m²) adjacent to the existing processing factory with an overall height of c. 11.2m; 5.Restoration thereafter to a combination of ecological habitat site and agricultural lands; 6.All associated site works within an overall application area of c. 15.8 hectares. The proposed operational period is for 25 years plus 2 years to complete restoration (total duration sought 27 years). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this planning application.
Retention of existing building as constructed, and permission for the use of the retained building as a dwelling house, alterations to the building, a new waste water treatment system and all site ancillary works. This application includes for permission for change of use of existing farm house to a permanent farm storage building
Retention of existing building as constructed, and Permission for the use of the retained building as a dwelling house, alterations to the building, a new wastewater treatment system and all site ancillary works. This application includes for Permission for change of use of existing farm house to a permanent farm storage building
For a proposed new two storey dwelling, proposed vehicular entrance, driveway, connection to public water main, packaged wastewater treatment system with percolation area, stormwater soakaways, landscaping and all associated site works
For domestic shed as constructed to rear of site and all associated site
To construct (1) cubicles shed with slatted tank (ii) overground slurry tower (iii) walled silage pits (iv) collecting yard and all associated site works. Demolition of walled silage pit and cubicle shed also required
The brief summarizes the pattern across all 196 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360097The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief