Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Eli Lilly pharmaceutical manufacturing complex, Ballythomas West, Ballythomas East, Horsehill More (North), Ballyvrin Lower, Dunderrow Kinsale, Co. Cork.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Eli Lilly pharmaceutical manufacturing complex, Ballythomas West, Ballythomas East, Horsehill More (North), Ballyvrin Lower, Dunderrow Kinsale, Co. Cork.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The site check found 662 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.

Matched source
24/6419
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

662Nearby applications
1Site-linked candidates
11%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

24/6419

A 10-year permission to construct a phased extension of the existing on-site Landscaped Earthen Berm previously permitted under Pl.Reg.No. 16/6558, 18/6137 and 21/6812 at the east of the overall campus. The proposed Landscaped Earthen Berm extension will cover an area of approximately 14,400m2, within a development area of 2.32 hectares, and formed with naturalised contours with slope grade of approximately 33% to a maximum height of approximately 8m above established ground level. All associated site development works including modification to the adjacent site storm water management features and site landscaping. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence (No. P0009-05) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.

Granted0.0 km18 February 2025
22/5840

Provision of a new single-storey electrical substation building with void below (gross floor area approx. 333sq.m, with a maximum height of 8.55metres at parapet level) and associated site development works. The proposed development also includes an extension to an on-site berm at the southeast of the overall complex. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The site comprises of an establishment to which the Chemicals Act (Control of Major Accidents Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.

Granted0.1 km30 September 2022
20/5304

A 10 year planning permission for development of a 5MW solar PV farm on a site at Ballythomas East, Dunderrow, Kinsale, Co. Cork immediately to the east of the existing Eli Lilly pharmaceutical complex. The electricity generated will be used by the Lilly pharmaceutical plant, which is an activity for which an Industrial Emmissions licence under Part IV of the Environmental Protection Agency Act 1992 (as amended) is in place. The development will comprise of photovoltaic panels on a mix of ground mounted and ballasted frames together with all ancillary cabling and electrical infrastructure; 1 no. single storey substation / transformer cabin; 1 no. single storey maintenance / spare parts cabin; provision of an access track (comprising largely of an upgraded existing agricultural track); a new construction vehicular access to the adjoining public road (L-7241); use of existing agricultural entrance for operational /maintenance purposes; temporary construction compound / set-down area; boundary security fencing and CCTV system; underground medium voltage electrical connection from substation / transformer building into the immediately adjoining industrial site; and all associated site development works, all on a site of 8.8 hectares.

Granted0.2 km18 August 2020
25/4210

Permission for the construction of a new utilities enclosure and associated works. The proposed development consists of the construction of a permanent prefabricated utilities enclosure within the pharmaceutical production site, of approx. 24.5sqm with a height of up to 4.5m, to the south of the existing IE42 production building with external equipment located adjacent to the enclosure, associated with the operation of the chiller. The proposed development is covered by an existing Industrial Emissions (IE) Directive License N0009-05. The proposed development refers to a modification to an establishment to which the Major Accident Regulations applies.

Granted0.3 km09 April 2025
21/6211

An extension to an existing solar farm development with Planning Permission Reference No. 20/05304 (granted 21/09/2020). The development will comprise of a 5.1 MW solar PV farm on a site at Ballythomas East, Dunderrow, Kinsale, Co. Cork immediately to the east of the existing Eli Lilly Pharmaceutical Plant. The electricity generated will be used by Eli Lilly Pharmaceutical site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The development will comprise of photovoltaic panels on a mix of ground mounted and ballasted frames together with all ancillary cabling and electrical infrastructure; 1 no. single storey substation / transformer cabin; 1 no. single storey maintenance / spare parts cabin; provision of an access track linking to the existing vehicular access track (granted under Planning Permission Reference No. 20/05304) which adjoins the public road (L-7241), temporary construction compound / set-down area; boundary security fencing and CCTV system; underground medium voltage electrical connection from substation / transformer building supplying the immediately adjoining industrial site; and all associated site development works, all on a site of 11.78 acres.

Granted0.4 km04 October 2021
21/6812

The development consists of a 10 year planning permission for development consisting of an extension to and modifications to a permitted pharmaceutical manufacturing building IE2B, the development will consist of a) a three-storey extension (gross floor area approx. 1,520sq.m. and approx. 27.5m high to parapet) with intermediate access platforms, at the western side of building IE2B, with external ground-mounted plant and equipment, roof stacks, roof-mounted plant and equipment and acoustic screening; b) associated external revisions to the permitted IE2B building including elevational modifications and revisions to roof plan, roof stacks, plant and equipment; c) provision of additional storage vessels (3 No.) in existing bunded bulk solvent storage tank farm to the east of the IE2 building; d) provision of additional bunded waste vessels (2 No.) beside the existing bunded waste solvent tank farm to south of IE4 building; e) provision of additional tanks on southern side of IE2B building (6 No. bunded tanks and 2 No. underground tanks); f) an extension to an on-site berm (permitted under Pl. Reg. Ref. 16/6558) at the south east of the overall complex; g) revisions to internal access road layout on the western side of the proposed extension; h) revisions to the permitted surface water drainage layout and attenuation systems for IE2B and proposed extension to comprise of new underground attenuation tank; and i) all ancillary site works including modifications to underground services, pipe bridges, lighting, hard surfaced areas and all ground works. The development is for the purposes of an activity which requires an Industrial Emissions (IE) License under Part V of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003). The current IE Licence (P0009-04) attached to the site will be reviewed for the purposes of the proposed development.The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies. An Environmental Impact Assessment Report will be submitted to the Planning Authority with the planning application.

Granted0.4 km08 December 2021

The brief summarizes the pattern across all 662 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required