Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 59 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For change of finishes to that granted in planning permision number 16/776 & 21/137. Proposed change is as follows: Natural slate to be removed from granted finishes for the roof and proposal change to a standing seam metal roof
To Extend the Appropriate Period of Planning Permission P16-776 to carry out the following works, the Demolition of an existing dilapidated two storey ruin, the construction of a new dwelling house, garage, site entrance, sewage treatment system with percolation area and all associated ancillary site works
For development, the development consists of the construction of agricultural loose house and associated site works
For development which consists of the construction of a slatted unit and associated site works
To carry out the following works. The demolition of existing side and rear extensions to existing dwelling, construction of a new extension to the rear and side of dwelling, along with all associated site works and services, to include a new wastewater treatment system, and bored well, using existing entrance from public road
To carry out the following works: the demolition of existing rear extension, construction of a new extension and modifications to existing dwelling house with all associated works, using existing connections to wastewater system, bored well and existing entrance from public road
The brief summarizes the pattern across all 59 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2511The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief