Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 952 decisions within 5 km, 3 exact-site or onsite candidate records, and 60 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
60 structured nearby appeal records.
60 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of 1. Revision of the western site boundary to that previously granted under PL17/221 with an overall increase in site area of 0.53HA 2. Erection of a prefabricated solvent storage shed adjacent to the northern site boundary 3. construction of 2Nr concrete bases and 2Nr waste compactor units to the western elevation of the new extension under construction 4. Carrying out all associated site development works deemed necessary as part of these works
To construct a 119.4sqm single storey extension to the northern elevation of existing structure to accommodate a new tool-room. To retain the construction of a pallet storage building which consists of a single storey steel shed type structure sited along the northern site boundary. All associated site development works deemed necessary.
Development consisting of a new Advance Office Building. Permission is sought for signage, new timber post-and-rail site boundaries, car parking, cycle shelter, bin store, landscaping, gas tanks, underground water storage tank, underground pumping station, ESB substation/switch room and all associated site works. A Natura Impact Assessment has been submitted to the Planning Authority with the Planning Application.
Alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development works
Development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting
Development consisting of the erection of a two storey extension to the rear of dwelling house
The brief summarizes the pattern across all 952 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18100The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief