Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 452 decisions within 5 km, 5 exact-site or onsite candidate records, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development, the development will consist of: 1) a prefabricated building to provide additional classroom space (as per planning reference P17/300) and, 2,) a sheltered play area, including all associated site works above and below ground
Is being sought for the construction of a single storey extension to the front of an ancillary office space to a childcare facility and the construction of a single storey sensory room in a new prefabricated building, including all associated site works above and below ground. Retention is also being sought for the construction of a single storey extension for an external WC to the rear of the building, including all associated site works above and below ground
For the construction of 2 no. detached dwellings and all associated site development works
To Extend the Appropriate Period of Planning Permission P18/581 for the construction of 2 no. detached dwellings and all associated site development works
For the installation of new electronic metal security gates for vehicular traffic, including electronic pedestrian security gate at existing site entrance to Harbour Village Apartment and Marina from public road ( R463), including new raised concrete road area, new raised footpaths, new metal railings to side boundaries; new surface water connection to existing surface water drainage within the site; new entrance signage, and associated site works
For the alteration to an existing planning application Planning Ref P22/253 to include an alteration to house numbers 21 – 27, including a revised site layout plan, alterations to house locations & boundaries, Revised elevations including a dormer window, a window in the gable, a revised rear boundary design and ancillary works
The brief summarizes the pattern across all 452 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221139The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief