Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 787 decisions within 5 km, 3 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXTENSION OF DURATION of planning file ref. 17/340 for construction of a new warehouse, with ancillary offices, toilets and loading facilities
Construct a two storey office block to the southern side of their existing building and all associated site works
For the following; (1) part change of use of ground floor storage space to laboratory & office accommodation to B2 building, (2) additional window opes added to southern & western elevations of B2 building and (3) LPG underground storage tanks at B2 site and all other ancillary works and PERMISSION for the following; (4) part change of use of ground floor storage space to office accommodation at B2 building, (5) additional window/door opes to south eastern & western elevations of B2 building and (6) external gas cylinder storage structure to northern boundary of B2 site together with all additional ancillary works
The erection of fencing, gates, barriers and ancillary works at the existing facilities
To construct a new 3G Synthetic surface playing pitch with 4 x 12m high Floodlights, 2.4m High Perimeter fencing with 2.4m high ball stop netting above perimeter fencing for total surround height of 4.8m, new 30m long x 5m high Pre-Cast Ball Wall with 4.5m Long Wing Walls to Southern End of proposed new pitch including all foundations and associated site services and all ancillary site services
An ancillary building to the main clubhouse consisting of a gymnasium along with associated site works
The brief summarizes the pattern across all 787 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22285The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief