Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 879 decisions within 5 km, 3 exact-site or onsite candidate records, and 44 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
44 structured nearby appeal records.
44 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of the alterations to elevations, including the omission of a glazed canopy and relocation of PV panels on the roof of Block K, previously approved under Planning Ref: PL 17/390 & PL 18/514
For development consisting of alterations to elevations of Block K previously approved under Planning Ref. PL 17/390
Replacement of 3no. signs and all associated site development works. Sign 1 (4.2m x 0.4m) is a low-level wall mounted illuminated sign at the left hand side of the main entrance. Sign 2 (4.2m x 0.4m) is a low-level wall mounted illuminated sign at the right hand side of the site entrance. Sign 3 (1.4m x 3.5m) is non illuminated triangle totem sign at the main site entrance at
Development consisting of alterations and refurbishment to the existing Block L and three-story extension with roof plant area, 50 number car park spaces covering the overall campus requirement, signage, PV Panels and all associated site development works. The development is within the curtilage of a protected structure St. Columba's Hospital Ref: 0953-23.
Development consisting of the construction of a new catering kitchen classroom extension with ancillary storage, sanitary accommodation along with all associated site works and services to the rear of the existing catering training building. Planning Permission is also sought for the change of use of an area of the existing catering training building from office and storage space to changing and locker rooms.
Development consisting of the construction of a new single storey extension, with a gross floor area of 117sq.metres together with all associated site works and connections to all public utilities
The brief summarizes the pattern across all 879 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19208The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief