Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,018 decisions within 5 km, 6 exact-site or onsite candidate records, and 81 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
81 structured nearby appeal records.
81 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To Extend the Appropriate Period of Planning Permission for P17/416 ABP Ref PL03.249071 for (1) the provision of a detached bungalow (140 sqm) including separate connections to the public watermains & public sewer and all associated site works. (2) Relocation of the existing vehicular entrance to no.6 and the provision of an additional vehicular entrance to the proposed dwelling, all to the front of No.6 off Woodlawn on a site to the rear
For a ground and first floor extension, conversion of an existing car port and shed to habitable space, changes to the existing elevations and connection to the mains sewerage
Of the demolition of parts of the original dwelling house structure which were to be utilized as part of Planning Reference P23/18 and (b) to retain the structure as constructed to date which has been constructed consistent with the original design granted planning permission under planning reference P23/18 and (c)PERMISSION to complete construction of the works in full accordance with and consistent with the original design granted planning permission under Reference P23/18
For 2 No. 5 bedroom detached dwellings. All including connection to water supply, public sewer, storm water sewer and all ancillary services
Of the development that includes a) rear house extension b) minor change to front facade to that granted to planning ref: 102/143 c) Sheds containing a boiler room and 2 No. storage rooms along with a water tank, d) a garage along with all ancillary site works
To remove the first floor balcony element built over part of the ground floor living area to the front of the existing dwelling, and replace with a pitched roof, and all associated site works
The brief summarizes the pattern across all 1,018 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23126The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief