Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 85 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
10 year permission for proposed development consisting of: (1) A 110kV electricity substation including 2 no. control buildings associated electrical plant and equipment, underground electricity cabling, fencing, alterations to a previously permitted borrow pit and temporary construction compound at the Carrigarierk Wind Farm (An Bord Pleanala Ref. PL04.246353, Cork County Council Ref. 15/730) in the townland of Carrigdangan; (2) 110kV underground electricity cabling connecting the proposed substation to the existing Dunmanway ESB substation in the townlands of Carrigdangan, Inchincurka, Kilnadur, Aultaghreagh, Aultagh, Ardcahan, Knockduff, Gurteennasowna and Ballyhalwick; (3) 33kV underground electricity cabling connecting the proposed substation to the permitted Carrigarierk Wind Farm through the townlands of Carrigdangan and Gortatanavally and the permitted Shehy More Wind Farm (ABP Ref. PL04.243486; Cork County Council Ref. 13/551), through the townlands of Shehy More, Coolcaum, Coolmountain, Tullagh, Lackabaun, Clogher, Farrannahineeny, Crushterra, Gurteen and Carrigdangan. Together with all ancillary works and apparatus. The proposed development is located north of Dunmanway, Co. Cork. This application is accompanied by An Environmental Impact Statement (EIS) and a Natura Impact Statement (NIS).
Construct dwelling, detached garage and all associated site works
Permission for retention of detached domestic garage
Completion of new dwelling. Foundations already present
Permission to demolish existing derelict dwelling, adjoining shed and detached shed. Permission is also sought to construct dwelling and all associated site works
(a) Retention of variation to elevations to that granted under planning permission Ref. No. 17/00642, and (b) permission for two storey extension to side of dwelling (change of plan and layout to that granted under planning Ref No. 17/00642
The brief summarizes the pattern across all 85 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17/431The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief