Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 701 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwellinghouse, domestic garage, waste water treatment system, percolation area and all associated site development works
The construction of a new 3 bedroom family home accessed using existing entrance and driveway, new waste water treatment unit, new mains water connection and associated site works.
Retention for a) as constructed domestic garage, b) secondary waste water treatment unit and polishing filter with all necessary ancillary site services.
Permission for a) the demolition of the open carport attached to the dwelling house, b) the construction of two extensions to the dwelling house, c) the construction of a terrace to the rear of the house with garden store beneath, d) the modifications to internal layout and plans of the dwelling and modifications to all elevations and roof of the dwelling, e) and all associated site works
Outline Permission for construction of a dwelling, new vehicular entrance and all associated site works
The construction of a dwelling, wastewater treatment plant, new vehicular entrance and all associated site works.
The brief summarizes the pattern across all 701 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/6095The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief