Applications tied to the site
Partial coverage18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 897 decisions within 5 km, 18 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new wheelchair accessible ramp between the existing station pedestrian entrance & the station platform. The works also include relocation of the existing railway maintenance vehicle entrance to accommodate the new ramp
Restoration, alteration and extension of an existing dwelling house which is a Protected Structure (RPS I.D 01715) including the demolition of existing ground floor and first floor annexes, construction of a new single storey ground floor extension, new first floor access, new site entrance, landscaping works, and all other ancillary site works
1. Demolition of single storey utility room annex to side of existing dwelling, 2. construction of 2-storey extension and single storey extension to side and rear of existing dwelling including the provision of roof terrace and balconies 3) installation of 2 no. rooflights to rear of existing dwelling
The construction of a dwelling house, garage, timber pergola, ground mounted solar panels and access roadway and all associated site works and services, including partial demolition to the existing boundary wall, a Protected Structure, to allow for the construction of a new vehicle entrance within the curtilage of a Protected structure.
Demolition of an existing shed and the construction of a residential development comprising 56 no. semi-detached dwellings (46 no. two-storey dwellings, and 10 no. part two-storey/part three storey split level dwellings, of which 43no. are 3-bed (optional 2-bed) and 13no. are 4-bed). The proposed development will also consist of all associated site development works, drainage and landscaping, as well as a new access from the public road, on a site of c.2.314ha. The proposed development is within the curtilage of 4 Norwood Villas, a Protected Structure (RPS No.21) Knockeven House, a Protected Structure (RPS No. 28), and Sacred Heart Convent and Lodge, Protected Structure (RPS Nos. 31,32,33 and 34). The proposed development is a revision to a previously permitted 61 no. unit residential development, register reference PL.53.221918 (06/52038), as extended under register reference EXT/D/2012/4.
Development of two waste facilities; a metal recycling facility and a recovered waste storage facility. The metal recycling facility will have a capacity of 45,000 tonnes per annum for the processing of scrap metal. All waste activities including acceptance, processing and storage [containers] will occur within an existing building [Hall A]. The finishes product will be transported either in bulk load or in containers depending on the end market. The baled recovered waste storage facility will accept a maximum of 45,000 tonnes per annum of recyclable materials recovered from household and commercial waste. This waste will be stored within an existing building onsite [Hall C] prior to shipping. There will be no processing activities within Hall C. A dedicated area [4,190 sq.m.] will also be established on the quayside for material storage prior to loading on ships. Other ancillary works will include the provision of a demountable weighbridge, re-surfacing of an existing hardstand area [1,040 sq.m.]; installation of a hydro-carbon interceptor and surface water holding tank. The two facilities will require waste facility permits from Cork County Council. An Environmental Impact Statement has been prepared in respect of the proposed development. Extension of Duration of Permission granted under An Bord Pleanála Reference PL53.240794 (Council Ref: 12/52007).
The brief summarizes the pattern across all 897 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/6108The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief