Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 689 decisions within 5 km, 2 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXTENTION OF DURATION for production and recovery facility for producing solvents from waste/recovered materials; 2 no. product manufacturing units, 6 no associated air circulation stacks; a tank farm for the recovered (raw material) and manufactured liquids, two storey administration building, a sprinkler tank, a surface water attenuation tank, a single storey pump house, a weighbridge and 22 no. carparking spaces, 6 no.cycle parking spaces, 2 no. HGV/container parking spaces, all ancillary works above and below ground, landscaping and boundary treatments. The application as described is for an activity which will be subject of an Industrial Emissions, (IE) Licence. An Environmental Impact Assessment Report (EIAR) together with revised plans to detail the reduced scale of the tank farm relocated away from boundary, roofed and with an enhanced landscaped buffer on all boundaries and retained tree groupings, has been submitted. Planning File: 17/6150 refers.
The production and recovery facility for producing solvents from waste/recovered materials; 2 no. product manufacturing units, 6 no associated air circulation stacks; a tank farm for the recovered (raw material) and manufactured liquids, two storey administration building, a sprinkler tank, a surface water attenuation tank, a single storey pump house, a weighbridge and 22 no. carparking spaces, 6 no.cycle parking spaces, 2 no. HGV/container parking spaces, all ancillary works above and below ground, landscaping and boundary treatments. The application as described is for an activity which will be subject of an Industrial Emissions, (IE) Licence. An Enivornmental Impact Assessment Report (EIAR) together with revised plans to detail the reduced scale of the tank farm relocated away from boundary, roofed and with an enhanced landscaped buffer on all boundaries and retained tree groupings, has been submitted.
The development consisting of the following works, warehouse and process hall with offices and welfare facilities (circa 1895 sq m) new road entrance, 2 no dock levellers to north facing elevation, new concrete yard, staff and visitor parking with all associated site works
Construct a single storey extension to the south western side of the existing building and all associated site services
Construction of a single storey extension to the southern side of the existing building and all associated site services
Construction of a two storey extension to the north western corner of the existing building to replace the existing single storey structure at the main entrance to the building, reconfiguration of internal layout and all associated site services
The brief summarizes the pattern across all 689 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22553The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief