Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 278 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a two storey dwelling house wastewater treatment system and all associated site works
Permission for the closing the existing site entrance and the construction of a new site entrance to the aforementioned property
Construct a straw storage shed and carry out associated site works
Construct two no. cattle houses, two no. slatted slurry tanks, two. no slatted soiled water tanks, construct a roof over existing open slurry storage tank, construct a roof over existing steel overground slurry storage tank, construct an earth walled bund to existing steel overground slurry storage tank, relocate existing soiled water storage tank and carry out all associated site works.
Change of use of existing farm outbuilding into single dwelling. Construction of two storey extension and canopy to the building. Alterations to existing building, reroofing, new windows and rooflights. Construction of new landscaping and the installation of a wastewater treatment system for the dwelling.
Construction of a dwelling house, part bungalow, part two storey and garage, conventional septic tank and percolation area and all associated site works
The brief summarizes the pattern across all 278 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/644The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief