Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 115 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of vehicular entrance as constructed to existing dwelling and for existing photovoltaic solar panels as installed on front roof of existing dwelling
To demolish existing out building and projections to side and rear of existing dwelling. Alterations to existing dwelling to include skylight to rear roof, replace existing front door with window and utility door with window. To construct a new single storey extension to rear of existing dwelling, install a new wastewater treatment system, polishing filter and all ancillary site works.
To construct a new dwelling house.
Construction of an extension to an existing dwelling, the demolition of a front porch and a rear extension, the widening of an existing entrance, the upgrading of the site on-site sewage treatment unit and all associated site works.
Remove the existing roadside boundary consisting of sod boundary with hedgerow and trees, and to construct a footpath with grass verges and concrete post and rail fence.
Permission for retention of existing detached domestic garage as constructed and permission to construct a new single storey extension to western gable and single storey porch to northern elevation of existing dwelling house.
The brief summarizes the pattern across all 115 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/6825The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief