Applications tied to the site
Partial coverage19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
19 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 889 decisions within 5 km, 19 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
19 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) Retention of the existing ground floor extension (30m2) and existing first floor extension (12.0m2) at the rear (south) of existing two-storey dwellinghouse, B) Permission to construct a ground floor rear extension-3.5m2 to be attached to the side of existing rear structure, thus making the rear annex the overall width of the site and C) Permission to construct a first floor extension-14.4m2 (continuation of existing first floor extension) over existing single storey annex (being retained) to the rear of existing dwellinghouse. This extension will have a fibreglass flat roof finish which will continue over existing first floor extension (being retained)-replacing the existing pitched roof-reducing the overall rear two-storey extension roof height
Retention of the existing two-storey extension and ground floor bathroom annex (single storey) located at the rear of existing dwelling house.
Permission for the demolition of an existing single storey rear extension and external shed, elevational changes to include the construction of a new single storey extension to the rear elevation and the construction of a new porch to the front elevation of existing dwelling house and all associated stie works
1) Retention Permission for the existing single storey annex (21m2) at the rear of existing dwellinghouse, and Permission for 2) modifications to existing dwellinghouse, namely; i) construction of a first floor extension to rear of existing dwellinghouse over existing ground-floor annex, ii) elevation changes to existing rear ground-floor annex with window & door opes, iii) construction of a single storey porch extension to front of existing dwellinghouse and (iv) insert 2no. velux rooflights on the rear roof of existing two-storey dwellinghouse.
Permission for Retention of the single storey extension located to the side (east) elevation and single storey extension located to the rear (north) elevation of my existing dwelling.
Modifications to existing dwellinghouse. Modifications to include; i) construction of a single storey extension to side (south) elevation, ii) replace the existing velux rooflight on front roof (east elevation) with a larger size velux rooflight, iii) insert 5no. velux rooflights on the existing rear roof (west elevation) and iv) modify/revise the existing windows & door ope – their locations & sizes on the existing front outshot (sitting room) in accordance with drawings submitted.
The brief summarizes the pattern across all 889 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/6933The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief