Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 125 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a single storey detached dwelling including a new site entrance, a waste water treatment unit, percolation area and all associated site works.
Construction of an animal house, silage slab, concrete apron, new site entrance and associated works.
Construction of 4 no. accommodation pods for short term letting to the rear of the existing dwelling house and installation of new on site waste water treatment system and all associated site works
The construction of four no. accommodation pods for short term letting to the rear of the existing dwelling house and installation of new on site waste water treatment system and all associated site works.
Permission for construction of extensions and alterations to an existing dwelling house, the installation of a new on-site wastewater treatment system, a new vehicular entrance and all associated site works.
Construction of a dwelling, garage, wastewater treatment unit, percolation area, well and associated site works.
The brief summarizes the pattern across all 125 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/6965The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief