Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 171 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a new classroom extension and an assisted user w.c. extension to the western side of the existing school along with all associated site works
Modifications and extension to the existing dwelling house namely: A) Removal of existing single-storey extension and existing two-storey extension to southwest-facing side of existing dwelling (Totaling 131.33 Sq.M. / 1413.63 Sq.Ft. floor space), B) Construction of a 75.75 SQ.M. / 815.37 SQ.Ft. Single-storey extension to southwest-facing side of existing dwelling, C) Installation of 2 no. first floor windows to southwest-facing side of existing dwelling, and D) All ancillary works
Planning permission for the construction of 32 no. 4 metre high column lights to illuminate a walkway and the upgrade of an existing 1.8 metre wide walkway with a tar finish and all associated site works
Construction of a 5m high hurling wall and 6 no. 12m high floodlights.
Construction of a single storey office building on and adjacent to their existing car park and associated siteworks at their existing facility. The proposed development is being carried out on a site which comprises of an activity requiring an Integraged Pollution Control Licence
The erection of a Monument Replica Train measuring 6.475m in length x 0.722m in width x 1.2m in height, and all associated site works.
The brief summarizes the pattern across all 171 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/7013The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief