Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 317 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolish existing single storey rear extension and to construct new single storey extension at rear of dwellinghouse, to construct detached domestic garage and to remove existing conventional septic tank and to install new sewerage treatment system
Demolish existing single storey rear extension and construct new two storey extension at rear of dwellinghouse, to construct detached domestic garage and to remove existing conventional septic tank and install new sewerage treatment system
Permission for construction of a dwelling house, construction of a new vehicular entrance, installation of a domestic waste water treatment system and all associated site works
A dwellinghouse, domestic garage, effluent treatment system and associated site works
Construction of new dwelling house and domestic garage, new entrance, waste water treatment system with all other ancillary site works.
Permission for construction of dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works.
The brief summarizes the pattern across all 317 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/7073The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief