Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 677 decisions within 5 km, 12 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new Mechanical Vapour Recompression (MVR) Evaporator Unit with ancillary fan house, 2 no. electrical switch rooms, 2 no. stillage tanks and a caustic tank. The proposed development makes provision for the relocation of existing chemical tanks, removal of existing access stairs, the provision of new access stairs and platforms and all ancillary site works
Permission for the demolition of 2 no. existing decommissioned industrial chimney stacks, comprising a boiler chimney (approximate height 46 metres) and a feeds recovery dryer stack (approximate height 41 metres), which is mounted to the roof of an existing feeds recovery building, and all ancillary site development works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purpose of activity requiring an Integrated Pollution Control Licence [Industrial Emissions Directive (IED) licence]
The subdivision of an existing warehouse to provide for the installation of a new steam boiler system and all ancillary site development works. The proposed development consists of the erection of an external piperack bridge to connect to an existing still house, the installation of 4 no. rooftop flues and elevational changes to the existing warehouse. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purposes of activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) License].
Retention of 4 no. pot still vents and 4 no. associated lightening masts to the roof of an existing still house. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purposes of activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) License].
The construction of a single storey extension to an existing warehouse and all ancillary site development works including the provision of a new access ramp. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purposes of activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) License].
A single storey extension to the rear of an existing office building to accommodate a canteen, staff welfare facilities, meeting/office space, service areas and all ancillary site works including the installation of rooftop photovoltaic panels. The proposed development involves the demolition of the existing single storey canteen building to the rear of the office building. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purposes of activity requiring an Integrated Pollution Control Licence [Industrial Emissions Directive (IED) Licence]
The brief summarizes the pattern across all 677 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17/7446The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief