Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 179 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The extension of the operational lifespan of a solar farm permitted by An Bord Pleanála under Ref. ABP PL24.248413 (Waterford City and County Council Planning Ref 17/96) from 25 No. years as permitted (by reason of Condition No.3 of permission Ref. ABP PL24.248413) to 40 No. years.
The replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (both previously permitted as part of a solar farm permission by An Bord Pleanála Ref. PL24.248413 (Waterford City and County Council Planning Ref. 17/96)) with 1 no. single storey 20kV substation building on the site of the previously permitted terminal station; and minor revisions to internal access track / hardstand adjacent to substation.
For a single storey detached dwelling, single storey detached garage, wastewater treatment system and associated percolation area, on site borewell and all associated site works at
To install a new wastewater treatment system and percolation area to serve the existing dwelling and all ancillary site works.
To construct (i) Cubicle Shed with underground slurry tanks (ii) soiled water tank and all associated site works
To provide a second pitch for underage games which is to have a 2.40m high weldmesh fence with a 3.60m of ball stop netting over this; all around a new 2.00m high weldmesh boundary fence to part of the Southern and Eastern boundaries of the site, 7.5m high ball stop netting at each end of the existing playing pitch, a 1.20m high retaining wall along the roadside boundary of the site with the existing clay bank being graded and planted, a new 1.80m wide footpath, alterations to the existing splayed entrance and all ancillary site works
The brief summarizes the pattern across all 179 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360317The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief