Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 124 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
To construct a battery storage compound adjacent to the existing Killaveenoge electricity substation at Curranashingane, Drinagh, Co. Cork. The proposed works for which planning permission is sought will involve the construction of new palisade fencing, access track, bunded concrete plinths, up to 5 no. battery storage units and associated equipment, transformers and all ancillary site works
Planning Permission for temporary camping pitches with associated site works
Construction of a dwellinghouse and domestic garage
Construct a milking parlour, dairy, plant room, office, feed storage bin, roofed cattle handling yard, two no. open cattle holding yards, concrete cow path, two no. slatted soiled water tanks, construct an extension to existing cattle house, extend existing slatted slurry tank, upgrade existing site entrance and carry out all associated site works
Construct dwelling and all associated site works
This development is to comprise of seven number electricity generating wind turbines with a hub height of up to 70 metres and a rotor diameter of up to 71 metres, an electrical compound, substation building, a 70 metres high permanent meteorological mast, four number car parking spaces and associated site roads and site works. It is proposed to source stone from an on-site borrow pit,
The brief summarizes the pattern across all 124 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/242The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief