Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 306 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a single storey dwelling, garage, wastewater treatment unit and all associated siteworks
Revision to previously approved 20/00711 new gym / training facility / equipment store, alongside existing Skibbereen Rowing Club
Construction of a new gym / training facility / equipment store, alongside existing rowing club
Permission for development of (i) a concrete sea wall with infill behind and a concrete slab over, (ii) a floating pontoon style dock comprising three stay bridges and one 30m floating section hinged off the proposed sea wall and (iii) all associated site works
Retain detached building consisting of artist studio / storage area / home office / utility space (All for Private Use) and ancillary to the main dwelling
Construction of dwellinghouse, garage, wastewater treatment unit and all associated siteworks including new site entrance
The brief summarizes the pattern across all 306 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/27The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief