Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Carbery Group Plant Carrigmore Dromidiclogh West Ballinneen, Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Carbery Group Plant Carrigmore Dromidiclogh West Ballinneen, Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The site check found 147 decisions within 5 km, 11 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
18/324
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

11 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

147Nearby applications
11Site-linked candidates
7%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

18/324

The demolition of an existing 2-storey detached dwelling and ancillary structures, including fencing, gates, and part of the existing front boundary walls; removal of existing signage; extensions to the main plant and warehouse building, to include: part single-storey/part 2-storey tank room/storage area, with upper floor laboratory/MCC room and lobby, to the south-western elevation; new door, part single-storey processing plant area, and 2-storey loading docks/office, to the southern elevation; new first floor processing/plant area to existing internal processing area; and new single-storey extension/infill to the existing internal open loading bay area, including increase in roof height. The proposed development will also consist of a single-storey extension to the existing chill water plant; signage: 5 no. car parking spaces; new doors/fire doors/roller shutter doors; 5 no. new storage vessels and associated pipe bridge; 10 no. existing storage vessels to be replaced and increased in height; additional roof-top plant (AHU's, extract fans, roof access ladders/gantry); all site development works, landscaping, drainage and ancillary development including: elevational treatment; revisions to the existing easternmost vehicular entrance, including erection of new retaining boundary wall and fencing; revisions to the westernmost vehicular access, including replacement and relocation of existing weighbridge and new single-storey weighbridge office and associated works; and the relocation of 3 no. flagpoles. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. This application relates to a development which comprises of an activity for which an Industrial Emissions License under part IV of the Environment comprising of an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency 1992 (as amended) is required. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.

Granted0.0 km10 September 2018
20/305

The construction of a new single storey electrical switch gear building with all associated ancillary services and site works. The sole use of the new building will be to contain electrical switch gear equipment and it will be located at the Carbery Food Ingredients Ltd. T/A Carbery Group facility in Dromidiclogh West, Ballineen, Co. Cork. The total area of the new building will be 53 m2. The proposed development is required to facilitate the upgrade of a transformer at the facility. This application relates to a facility which comprises of an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency Act, 1992 (as amended) is required. This application also relates to an establishment to which the Major Accidents Directive applies. A Natura Impact Statement is not required for this proposed development.

Granted0.2 km04 September 2020
22/410

Construction of detached dry goods storage shed and all associated site works

Granted0.2 km06 October 2022
17/724

A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 10.18 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV, and all associated ancillary development works

Granted0.7 km06 June 2018
24/474

A 10 year permission for a solar farm consisting of solar photovoltaic panels on ground mounted frames, 1 single-storey substation, 1 single storey control room, 1 single-storey transformer station, 1 single-storey spare parts storage container, 1 clear-span bridge, internal access tracks, security fencing, CCTV, landscaping and all associated development site works. The solar panels are arranged within a total developable site area (including ancillary works) of 11.34ha

Granted0.7 km30 March 2025
24/598

Construction of new dwelling house, new entrance, domestic garage, wastewater treatment system together with all other ancillary site works

Granted0.9 km12 December 2024

The brief summarizes the pattern across all 147 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required