Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 287 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Construct a Biogas Plant consisting of 2 no. digester tanks, 2 no. validation tanks, 1 no. homogenising tank, 3 no. geo-membrane lined manure storage tanks, 1 no. fibre store, 1 no. feed tank, reception building, plant building, pasteurisation tanks, weighbridge and associated site works including an integrated constructed wetlands to produce renewable energy and fertilizer
A) The construction of a pedestrian underpass on the L-8107-0 providing access from the staff carpark to the factory building, b) the construction of a building over an existing mechanical plant within the waste water treatment plant as granted under planning 17/162 c) all associated site works. This application relates to an establishment which has an Industrial Emissions License & an Integrated Pollution Control License (P0947-01).
A) construction of an acoustic wall and associated canopy, B) all associated site works. This application relates to an establishment which has an Industrial Emissions License and an Integrated Pollution Control License (P0947-01).
Extension to the western elevation of the existing pig processing facility consisting of: a) new box storage & packaging store b) the relocation of an existing packing store, curing room, blast chill & freezers to allow for an increase in dispatch area within the existing building c) all associated site works. This application relates to an establishment which has an Industrial Emissions License and an Integrated Pollution Control License (P0947-01).
A) the demolition of an existing office / amenity building and 2 no. over ground tanks. The construction of: b) a two storey office / amenity building c) 3 no. over ground water storage tanks d) a fire water retention lagoon e) all associated site works. An Environmental Impact Assessment Report (EIAR) & Natura Impact Statement (NIS) has been prepared and shall be submitted to the Planning Authority with this application
Extensions and alterations to existing dwelling house.
The brief summarizes the pattern across all 287 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/4The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief