Applications tied to the site
Partial coverage18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 840 decisions within 5 km, 18 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The retirement of the existing 38 kV substation to include demolition of the existing 4.1m x 4.1m control hut and removal of existing transformers, 38 kV and Medium Voltage (MV) busbars and other items of plant
Demolish existing outhouses and for the construction of 3 no. dwellinghouses and to carry out all associated siteworks
Permission for the construction of the following: (1) two no. warehouse/light industrial buildings (no. 8 & no. 9) which will be sub divided into 4 separate units (no's 8-1, 8-2, 9-1, 9-2). All units contain ancillary office space, (2) construction of an access road, (3) signage, car parking, site fencing, site lighting, drainage systems and roof top solar PV panels and storm water infiltration basin and (4) all associated site development and landscaping works.
Construction of truck haulage depot including site office, water and diesel storage sheds, truck washing with percolation area, re-location of vehicular entrance, HGV parking, new footpath, palisade fencing and all associated site works.
Demolition of existing dwelling house and construction of 3 no. detached dwelling houses, alterations and widening of existing site entrance, new roads/services and all ancillary site development works.
Demolition of existing dwelling house and construction of 3 no. detached dwelling houses, alterations and widening of existing site entrance, new roads/services and all ancillary site development works for Extension of Duration under Pl.Reg.No. 18/5778.
The brief summarizes the pattern across all 840 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4075The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief