Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 739 decisions within 5 km, 20 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention basement extension to an apartment comprising bedroom, utility room, bathroom and alterations to elevations.
Permission for the construction of extensions, replacement of windows & external doors and internal & external alterations to an existing apartment including re-connect to existing on site services (foul & storm) and all associated site works.
Permission for alterations to an existing apartment, comprising of; 1) replacement of existing external windows and doors, 2) construction of 1 no. new rooflight opening to the front (north) and 2no. new rooflight openings to the rear (south) of the roof of the existing apartment, 3) conversion of attic space, to accommodate a master bedroom suite, 4) re-connect to existing site services (water, foul, and storm), with associated site works.
Construction of a refuse bin store and all associated site works
(1) The removal of 2 no. existing rooflight openings and the installation of 2 no. larger rooflight openings to the rear (south) roof and (2) the installation of 2 no. additional rooflight openings to the front (north) roof.
Construction of retaining wall (maximum height 4.2m above existing ground level) to retain existing slope to rear carpark of existing residential development and associated site works
The brief summarizes the pattern across all 739 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4368The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief