Applications tied to the site
Partial coverage17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 322 decisions within 5 km, 17 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To carry out the following on the site of existing Baby Food Production Facility: (a) Extend 3 no. existing exhaust ducts located on the roof of the M2 drying tower by 10 metres in height together with all necessary support steelworks and access ladders and (b) extend 1 no. existing exhaust duct located on the roof of the M1 drying tower by 10 metres in height together with all necessary support steel work and access ladder. The development relates to an activity in relation to which a revised Integrated Pollution Prevention and Control Licence is required.
To carry out the following on the site of existing baby food production facility: (a) Construct a single storey process area extension on to the eastern elevation of the existing powder store (b) Installation of HVAC equipment and support steelwork for same on to the roof of the new extension (c) Construction of a galvanised pipebridge between the new extension and the existing intake lanes also located on the eastern elevation of the existing facility (d) Upgrade of the existing waste water treatment plant with the addition of an increased capacity clarifier (e) Re-route the existing underground drainage pipework to facilitate the new process area extension (f) Permission for retention of the existing air compressor room which is located on the eastern elevation of the existing services building (g) Associated siteworks. The development relates to an activity in relation to which a revised integrated pollution, prevention and control license is required.
(a) Construct an extension on to the existing Laboratory located on the eastern elevation of the existing Administration Building. (b) Construct an extension to the northern elevation of the existing Weighbridge Office and changes to the eastern and southern elevation of the existing Weighbridge Office and (c) Associated Siteworks. The development relates to an activity in relation to which a revised Integrated Pollution, Prevention and Control License is required.
(a) Construct a single storey extension to the western elevation of the existing office building, (b) construct an extension to the existing staff carpark and all associated site works. The development relates to an activity in relation to which a revised integrated pollution prevention and control licence is required.
To carry out the following on the site of their existing baby food production facility: a) Construct an extension to the Southern elevation of the existing pallet store and associated site works and b) Construct an extension to the existing dispatch facility on the Southern elevation to include 1 no. additional lorry dock leveller and associated overhead dock leveller canopy. The development relates to an activity in relation to which a revised Integrated Pollution, Prevention and Control License is required.
To carry out the following on the site of existing baby food production facility: (a) Construct a single storey warehouse extension on to the eastern elevation of the existing warehouse (b) Construction of a new loading bay and associated canopy on to the southern elevation of the proposed warehouse extension (c) Construction of a sprinkler valve room on to the western elevation of the proposed loading bay (d) Installation of HVAC equipment and support steelwork for same on to the roof of the proposed warehouse extension (e) Associated siteworks. The development relates to an activity in relation to which a revised Integrated Pollution, Prevention and Control Licence is required.
The brief summarizes the pattern across all 322 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4402The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief