Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 36 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct 2 no. new entrances and access roads by adjusting the width of the 2 no. existing entrance gates into existing forestry plantations
To construct a new dwelling house.
To construct a new dwelling house.
To construct a dwellinghouse
10 Year Planning permission for a solar array with a total area of circa 16 hectares. The development will consist of solar panels on ground mounted frames, 2 no. single storey control cabins with associated electrical transformer unit and hardstand areas, 1 no. ring main unit, underground cabling within the solar array site to connect solar array field parcels, 33kV underground grid connection cabling to the existing Bweeng 38kV substation (within Esk windfarm), security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to existing agricultural field entrance on the L5258, landscaping and all associated ancillary apparatus and development works. Operational access will be via the entrance from the L5258. The solar array will connect to the national grid and will have an operational lifespan of 40 years. Planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Installation of a cattle underpass, soiled water tank and associated works.
The brief summarizes the pattern across all 36 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4448The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief