Applications tied to the site
Partial coverage23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 292 decisions within 5 km, 23 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Minor alterations to the roof to the rear (north) of existing Aldi store to facilitate the construction of a rooftop enclosure, comprising a walk-in compressor pack unit and a gas cooler, external access stairs to the rear (north) of the existing Aldi store, and all associated works at the existing Aldi store.
Permission for alterations, refurbishment and change of use existing disused mill building to cultural recreation and visitor centre, interpretive meeting space with function rooms, commercial space on ground floor with operational use of ground floor as retail/café space and apartment on level 3. This is a protected structure (reference cork RPS no 107). The development will comprise of a) alterations to ground, first, second and third floors of the existing structure, b) alterations to all external elevations and replacement of the existing roof, c) hard and soft landscaping to courtyard, d) entrance gates to the north and east boundary, e) all associated site development works and services (car parking and vehicular access from adjoining site) as per permitted drawings.
Permission for alterations, refurbishment and change of use of existing disused mill building to cultural re-creation centre and visitors centre, interpretive meeting space with function rooms, commercial space on ground floor with optional use of ground floor space as retail/café space and apartment on level 3. This is a protected structure (reference cork RPS no. 107). The development will comprise a) alterations to ground, first, second and third floor of existing structure, b) alterations to all external elevations and replacement of the existing roof, c) hard and soft landscaping to courtyard, d) entrance gates to the north and east boundary, e) all associated site development works, services and car parking. Extension of Duration to Permission granted under Planning Ref. No. 17/7344
Permission for alterations, refurbishment and change of use of existing disused mill building to cultural re-creation and visitors centre, interpretative meeting space with function room, commercial space on ground floor with optional use of ground floor space as retail/cafe space and apartment on level 3. This is a protected structure (Reference cork RPS No 107). The development will comprise of (a) alterations to ground, first, second and third floors of the existing structure, (b) alterations to all external elevations and replacement of the existing roof, (c) hard and soft landscaping to courtyard, (d) entrance gates to the North and East boundary, (e) all associated site development works, services and car parking.
The change of use of part of the service station retail shop area to off licence retail area
The alteration and extension of the existing service station forecourt to include the raising of the ground level and amalgamation of the gravel area for the purpose of a car park on the northern side of the site, the relocation and replacement of existing pump islands and canopy, to relocate the existing car wash 2.5m in a northern direction, a paved outdoor seating area, revised signage at the entrance and within the forecourt, additional landscaping along the northern and eastern boundaries, new signage on the northern and western side of the existing forecourt building, alterations to the existing vehicular entrance and exit and all ancillary site development works and services.
The brief summarizes the pattern across all 292 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4495The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief