Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 355 decisions within 5 km, 20 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
To construct 3 no. new dwellings, modifications to existing boundary treatments and construction of new boundary treatments, 3 no. new site entrances. Permission for 3 no. new connections to public water main, 3 no. waste water treatment units and percolation areas for 3 no. dwellings, construction of 3 no. rainwater soak pits and associated site works. Permission to construct public footpath with associated drainage and associated site works.
To construct 3 no. new dwellings, modifications to existing boundary treatments and construction of new boundary treatments, 3 no. new site entrances. Permission for 3 no. new connections to public water main, 3 no. waste water treatment units and percolation areas for 3 no. dwellings, construction of 3 no. rainwater soak pits and associated site works. Permission to construct public footpath with associated drainage and associated site works.
Permission for the construction of a single storey detached structure to the existing dwelling, for use as a home office, and all ancillary and associated site works
Permission for retention for (a) domestic garage as constructed, (b) alterations to elevations of dwelling house and increase footprint at ground and first floor level to extension permitted under Planning Reg. No. 16/5193
The construction of 2 no. dwellinghouses with new vehicular entrance, and all associated site works.
(i) To develop an all-weather floodlit playing pitch with a 3m high perimeter fencing with 3m high ball netting above and a 5m perimeter fencing to the northern boundary with a 3m high ball netting above, the floodlighting will consist of 4 no. 12m high poles with Mega Lord Led 600W lights (ii) to develop a basketball court with a tarmacadam surface finish (iii) associated site drainage works and site works.
The brief summarizes the pattern across all 355 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/4643The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief