Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,220 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A battery storage facility within a site area of approximately 0.72 hectares. The batteries will be housed in 8 no. metal containers with external air conditioning units, each container will have a Gross Floor area of approximately 41.8sq.m. Permission is also sought for 8 no. inverter stations, 1 no. on-site substation, 1 no. 38kv transformer, underground cables and ducts, a new entrance to the public road, boundary security fence, new internal access track, security lighting, CCTV cameras and all ancillary services and works. Planning permission is sought for period of 10 years.
Permission for 1 no. Dormer Bungalow.
Permission for the installation of solar carports and ground mounted solar PV arrays. The proposed development will consist of single and double row mono-pitch solar carports over existing surface car park areas, solar panels on ground mounted frames, 1 no. single storey low voltage/medium voltage transformer unit, 2 no. spare parts containers, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for car port areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via an existing entrance from the R613. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies
Permission for retention of an ESB substation and generator in revised position to that permitted as per reg. ref 22/4629
The construction of a two storey value added seafood factory building with R&D and ancillary office accommodation to the first floor, complete with the following (i) signage (ii) car, cycle and motorcycle parking; (iii) internal access roadways, yard area with dock levellers, w.c. and shower facilities, back-up generators, and bunded fuel tanks (iv) fire water storage tank and associated pumps; (v) substation; (vi) security gates and fencing (vii) 1 no. access to the estate road; (viii) underground storm water attenuation, and all associated site development and landscaping works.
1. Construction of ground floor extension (kitchen/playroom) at the rear of existing dwelling. 2. Conversion of existing original garage to dining room. 3. Construction of garage/storage shed at the side of existing dwelling. 4. Metal garden shed and timber outhouse for storage at the rear of existing dwelling and all associated site works.
The brief summarizes the pattern across all 1,220 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4664The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief