Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 631 decisions within 5 km, 20 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The following works at the existing IE09C administration building: (1) Construction of a new single storey extension of gross floor area 92.78m2: (2) All associated internal modifications to facilitate the new extension and (3) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an establishment to which the Major Accidents Directive applies.
The development will consist of: (1) The construction of a two storey building (IE40) for staff services and facilities including canteen, kitchen, gym, studio, changing facilities, offices, meeting rooms and administration areas with roof top plant enclosures, (2) Extension to the existing staff car park to provide an additional 150 permanent car parking spaces, (3) The creation of a new vehicular car park entrance gate on the Ballyvrin Road (L3215) northern boundary road, (4) All associated site development works including modifications to the internal site roads and site services, construction of external hard standing and landscaped areas and a single storey ancillary kitchen store, site lighting and fencing, 3 no. flagpoles and associated signage and the formation of landscaped areas, including berms and visual screening with tree planting and contractor’s temporary car park. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.
The development consists of a 10 year planning permission for development consisting of an extension to and modifications to a permitted pharmaceutical manufacturing building IE2B, the development will consist of a) a three-storey extension (gross floor area approx. 1,520sq.m. and approx. 27.5m high to parapet) with intermediate access platforms, at the western side of building IE2B, with external ground-mounted plant and equipment, roof stacks, roof-mounted plant and equipment and acoustic screening; b) associated external revisions to the permitted IE2B building including elevational modifications and revisions to roof plan, roof stacks, plant and equipment; c) provision of additional storage vessels (3 No.) in existing bunded bulk solvent storage tank farm to the east of the IE2 building; d) provision of additional bunded waste vessels (2 No.) beside the existing bunded waste solvent tank farm to south of IE4 building; e) provision of additional tanks on southern side of IE2B building (6 No. bunded tanks and 2 No. underground tanks); f) an extension to an on-site berm (permitted under Pl. Reg. Ref. 16/6558) at the south east of the overall complex; g) revisions to internal access road layout on the western side of the proposed extension; h) revisions to the permitted surface water drainage layout and attenuation systems for IE2B and proposed extension to comprise of new underground attenuation tank; and i) all ancillary site works including modifications to underground services, pipe bridges, lighting, hard surfaced areas and all ground works. The development is for the purposes of an activity which requires an Industrial Emissions (IE) License under Part V of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003). The current IE Licence (P0009-04) attached to the site will be reviewed for the purposes of the proposed development.The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies. An Environmental Impact Assessment Report will be submitted to the Planning Authority with the planning application.
Permission to construct a Biomass Steam Boiler Facility that includes: A) Demolition of existing single storey temporary warehouse building. B) Construction of single storey building with parapet height of 20.3m with part mezzanine floors within. C) A chimney stack with height of 23.15m. D) Above ground pipe rack measuring 55m long x 3.5m wide with an overall height of 11.58m. E) Underground services, drainage and other associated site development works. The proposed development is covered by an existing Industrial Emissions (IE) Directive Licence No. P0009-05 under Part IV of the Environmental Protection Agency Act 1992 (as amended). The proposed development refers to a modification to an establishment to which Major Accident Regulations applies.
Permission for the construction of a new utilities enclosure and associated works. The proposed development consists of the construction of a permanent prefabricated utilities enclosure within the pharmaceutical production site, of approx. 24.5sqm with a height of up to 4.5m, to the south of the existing IE42 production building with external equipment located adjacent to the enclosure, associated with the operation of the chiller. The proposed development is covered by an existing Industrial Emissions (IE) Directive License N0009-05. The proposed development refers to a modification to an establishment to which the Major Accident Regulations applies.
The development will consist of the provision of a single-storey building extension (gross floor area of approx. 172sqm and building height of approx. 6.6m) to an existing electrical load centre building (LC7) and associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 ( as amended for the Protection of the Environment Act 2003). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances ) Regulations 2015 (S.I.209 of 2015) applies.
The brief summarizes the pattern across all 631 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4901The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief