Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 167 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A single storey dwellinghouse, garage, effluent treatment system, polishing filter, new entrance and all associated site works
Permission to demolish existing farm shed, existing outhouse and existing front porch to dwelling and for construction of extension to side of dwelling and alterations to front of dwelling and for replacement roof to existing dwelling and all associated site works including installation of new wastewater treatment unit and soil polishing filter.
Permission to construct a shed for domestic use and all associated site works.
1) Permission to retain alterations to the existing garage roof and the new door installed at the rear of the garage, and for 2) Permission to construct a shed for domestic use, and all associated site works.
Existing dwelling as constructed, attached garage, existing site entrance as constructed, existing waste water treatment unit as installed, revised site boundaries and the increasing size of site and all associated site works.
Permission for retention and demolition of existing concrete base, retention of existing hardstanding area/access driveway and permission to construct a dwellinghouse and all ancillary site works
The brief summarizes the pattern across all 167 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/4941The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief