Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 96 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of a detached garage and all associated site works
Construction of agricultural shed for the storage of agricultural machinery / fodder storge and for all associated site works
Permission for the following works to existing dwelling-house: (i) extension to rear of house, (ii) construction of 4 no. dormer windows to front of house, (iii) construction of one additional standard window to front of house, (iv) change of use of attached outbuilding to be incorporated within main house and (v) associated site works
Construction of an amenity / shelter building for use ancillary to the existing pod park, a temporary construction site entrance (to be removed and made good upon completion of the proposed works) and all associated site works
The installation of 6 no. camping pods, a reception building, installation of a treatment plant and all associated site works
To install 6 no. camping pods, a reception building, to install a treatment plant and all associated site works. An Environmental Impact Statement (EIS) has been prepared and will be submitted with the application
The brief summarizes the pattern across all 96 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/508The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief