Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 417 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consists of restoration of part (c. 6.7 ha) of existing quarry (QR19 06/11798 & PL04.225332) by importation of up to 300,000 tonnes per annum of inert soil and stones and river dredging spoil (EWC 17-05-04 and 17-05-06).The proposed soil recovery facility will utilise the permitted quarry infrastructure including internal roads, site office, welfare facilities and other ancillaries to complete the works. Access to the site will be from the permitted main entrance on the N22 National Primary Road. A wheel wash and weighbridge will be provided as part of the proposed development and the existing workshop will be utilised as a quarantine area. A hard-stand with drainage to oil interceptor will also be provided as a designated refuelling area. The total application area including the site infrastructure covers 7.9 ha of lands. The development will be subject to the requirements of the waste management licence. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application.
To construct a dwelling and domestic garage and installation of wastewater treatment unit, percolation area and all associated site works.
To construct a dwelling and domestic garage and installation of wastewater treatment unit, percolation area and all associated siteworks
To construct a dwellinghouse
Construct a dwelling house.
Permission to demolish existing derelict house and construct a storey and a half style dwelling, septic tank and percolation area and all associated site works.
The brief summarizes the pattern across all 417 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/5155The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.