Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 180 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a two-storey dwellinghouse, domestic garage, on-site sewage treatment system and all associated site works.
Construction of a dwelling-house, carport, domestic garage, on-site sewage treatment system and all associated siteworks.
Construction of a dwelling house, a garage for domestic purpose, installation of a domestic water treatment system, construction of a new vehicular entrance and to carry out all associated site works.
Construction of a two storey addition to an existing dwelling house, alterations to existing cottage, demolition of existing annex to cottage and provision of new pedestrian entrance, formation of new vehicular entrance to public road and blocking up of existing vehicular entrance, construction of new shed, a new wastewater treatment system and all associated site works
Demolition of existing cottage and construction of dwellinghouse and associated site works incorporating new public road entrance - Extension of Duration of Permission granted under Planning Reference: 14/5073
Construction of a dwelling house, domestic garage, on-site sewerage treatment system and all associated siteworks.
The brief summarizes the pattern across all 180 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/5259The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief