Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 216 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of 2 no. existing storage buildings, the demolition of 2 no. existing external steel grain storage silos; and all associated site development works.
(1) Construction of new Agri & Retail Branch Store comprising of Retail Shop, Store, Ancillary Offices, Staff Facilities, Canopy and Facade Signage; and (2) New Concrete Yards Areas, Customer Car Parking, Boundary Treatments, Wastewater Treatment Unit & Percolation Area and all Associated Site Development and Drainage Works.
The extension of the existing reinforced concrete retaining wall & paladin mesh fence on the southwest site boundary, extension of existing concrete yard area to the west of the existing retail store and all associated site development and drainage works
To (a) Construct a new single storey extension to the south-west of the existing school containing a 3 classroom suite of SEN (Special Education Needs) accommodation consisting of multi-sensory room, para-educational room, central activity space, withdrawal rooms, a new corridor link, storage and w.c. /shower facilities (b) Single storey extension to the north-east consisting of 2no. mainstream classrooms, new staff room and staff toilets (c) Remodelling of a section of the existing school to accommodate a new office, boiler house, Dis W.C, a principal’s office and internal link corridor (d) Proposed temporary decanting prefabricated unit during construction works (e) Removal of 4no. existing prefabricated structures – total area of 203 sqm (f) Erection of photovoltaic panels on the roof, signage and all alterations to the existing facades (g) Removal of the existing on-site sewage treatment unit and construction of a new pumped rising foul sewer from the school on the public road up to the existing Grenagh Waste Water Treatment Plant (h) Construction of all retaining walls, gas storage tank compound, external ramps & steps, temporary construction access and all associated site works.
Construct a new dwellinghouse.
Permission to construct a new dwelling house
The brief summarizes the pattern across all 216 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/5448The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief