Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 184 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations to elevations, extension to sides and rear and raising ridge height of roof to provide first floor living space to existing single storey dwelling and all associated site works
Construction of a livestock underpass, effluent holding tank, relocation of agricultural entrance and all associated siteworks.
Effluent treatment system and percolation area to replace existing septic tank and permission for retention of a single storey out building attached to the rear of the dwelling house for the purpose of storage
(a) Demolition of existing outbuildings, (b) construction of a new extension to the southern elevation of the existing dwelling house, (c) material alterations to the internal layout of the existing dwelling to link the new extension with the existing dwelling, (d) construction of new granny flat to be incorporated into the new extension and (e) all associated siteworks.
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and new entrance.
For the importation of clean and inert soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field, including the forming of an artificial pond/ wetland area, the construction of a new temporary haul road and a site entrance as well as all other necessary enabling works
The brief summarizes the pattern across all 184 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/5673The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief