4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 259 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of single storey dwelling house, detached garage, wastewater treatment system and percolation area, vehicular entrance, site boundary treatments and all ancillary works.
The renovation and extension of existing single storey dwelling to include new slate roof to existing dwelling, two storey extension to rear and side, removal of existing derelict porch to side, renewal of existing entrance, new septic tank and all associated site works
To construct dwelling, septic tank, entrance and associated site works
The importation of soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary haul road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.
The importation of soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary haul road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.
Importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary haul road.
The brief summarizes the pattern across all 259 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/5822The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief