Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 354 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of new dwellinghouse, domestic garage, new entrance together with all other ancillary site works.
Permission for the construction of new dwelling house and domestic garage, new combined entrance, wastewater treatment system together with all other ancillary site works
Permission for the construction of new dwelling house and domestic garage, new combined entrance, wastewater treatment system together with all other ancillary site works
2 storey dwelling, domestic garage, sewerage system, site entrance and all associated works.
Permission for construction of a dwelling house (change of plan and orientation of the house from that permitted under 21/4189)
The construction of two detached dwelling houses, two domestic garages and a new entrance road to serve the two dwellings and future sites. The road to include new effluent pipework and pumping station, stormwater drainage, street lighting and all ancillary siteworks.
The brief summarizes the pattern across all 354 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6351The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief