Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 51 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct an entrance and access road to a forestry block and all associated site services.
Permission for alterations, refurbishment & single storey extensions to an existing derelict dwelling, a waste water treatment system on the site, a new splayed vehicular entrance to the site from the public road and all other associated site works.
Permission for retention for dwellinghouse as constructed and permission for ground floor and first floor extension to dwelling house, with alterations to elevations and associated site works.
The continued use of an existing, temporary lattice type meteorological mast, 80m in height. The structure is fixed to ground mounted anchors by guy wires and includes associated instruments to measure local meteorological conditions. Permission is sought for a period of 5 years. The mast was erected on site as exempted development pursuant to Class 20 (A), Part 1 Schedule 2 of the Planning & Development Regulations 2001 (as amended) in November 2019.
Construct an entrance and access road to the forestry block and all associated site services.
New single storey and two storey extension to side of existing two storey dwelling, new sewerage system upgrade to existing system and all associated works.
The brief summarizes the pattern across all 51 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6358The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief