Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 116 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new 13m diameter, 4m high circular water storage reservoir. The works will also comprise of a new perimeter and access gate, internal site roadway and all associated ancillary works and other enabling civil works.
The construction of a two-storey dwelling house, single-storey garage and all associated site works.
Permission for retention to retain dwelling house and domestic garage as constructed and associated site works all within revised site boundaries
The development of a new potable water pumphouse. The development will compromise the construction of a new single storey potable water pumphouse. The pumphouse will contain pumping, chemical dosing and welfare facilities. The works will also compromise the construction of a new perimeter, access gate, internal site roadway, and all associated ancillary works and other enabling civil works. A Natura Impact Statement will be submitted to the Planning Authority with the application.
(i) Demolition of garage, shed and part of dwelling, (ii) construction of dwelling incorporating the remaining part of the original dwelling into same, (iii) treatment unit, (iv) domestic garage, and (v) new entrance and all associated works. Extension of Duration of Permission granted under Planning Reference: 14/5205.
The construction of dwellinghouse, domestic garage, new entrance, waste water treatment system together with all other ancillary site works.
The brief summarizes the pattern across all 116 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6424The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief