Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 379 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A slatted animal house with handling area, slatted tank, store and associated works.
A slatted animal house with handling area, slatted tank, store, silage slab and associated works
(1) Domestic sheds including screen wall, (2) Dwelling including extension, as constructed (3) Vehicular entrance.
Retention of materials recovery facility. The proposed development will consist of (a) Retention of (1) an existing waste sorting building, (2) office building, (3) temporary workshop building, (4) weighbridge, (5) generator building, (6) electrics building, (7) vehicle wash area, (8) fire water holding tank and plant room, (9) skip storage area, (10) external waste processing area, (11) external construction and demolition (C&D) waste storage area, (12) foul and surface water tanks, (13) bored well and (b) Permission for: (1) demolition of the existing waste sorting building (damaged by fire), office building and temporary workshop/store, (2) removal of the 3 no. portacabins, (3) construction of an office building, (4) construction of a waste sorting building, (5) installation of a septic tank, (6) modifications to the existing access including the provision of entrance gates, and (7) all ancillary external storage of materials, parking, landscaping and site development works, No. change is proposed to the annual tonnage of 6,500 tonnes per annum. The proposed development comprises and activity requiring a Waste Licence.
The increase to the annual tonnage from 6,500 tonnes per annum to 16,500 tonnes per annum at a resource, recovery and recycling facility. The proposed development comprises an activity requiring a Waste Licence.
The construction of a dwelling house, waste water treatment system, site entrance and all associated site works.
The brief summarizes the pattern across all 379 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6592The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief