Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 474 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of the two storey extension constructed to the rear of the dwelling.
Construct 2 no. dwellings, 2 no. site entrances and all associated site works and services.
Construction of dwelling, entrance and associated services.
Permission for the development will consist of high-power electric vehicle charging points and associated infrastructure consisting of the following: 1) installation of 8 no. electric vehicle charging bays with 8 no. Tesla illuminated charging units and associated signage, 2) installation of proposed Tesla supercharger power cabinet equipment, 3) installation of proposed modular substation, 4) erection of associated EV signage, 5) all associated site development works including lighting & line marking.
Permission to construct a dwelling, site entrance and all associated site works and services
The construction of 52 no. residential units comprising of 12 no. 3 bed units, 18 no. 2 bed units and 22 no. 1 bed units [a mix of 3 bed townhouses, 1 & 2 bed maisonettes and 1, 2 & 3 bed own-door apartments]. The units range in height from 2 to 3 storeys. Permission is also sought for the construction of 3 no. commercial units [Beauty Salon/Coffee Shop/Café and Newsagents] as well as a multi-purpose/ community space at ground floor level. The development also includes landscaping, drainage, boundary treatments, 96 no. bicycle parking spaces, 57 no. car parking spaces, bin storage, play area, planting/screening and all associated site development works at Ballydaheen Road/ Mill Street, Ballydahin, Mallow, Co. Cork. A Natura impact statement will be submitted to the planning authority with this application. The Natura impact statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.
The brief summarizes the pattern across all 474 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6625The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief