Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 145 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
The erection of a marquee coinciding with specific major community events for a total of 130 no. days in each year and all associated ancillary development works. The marquee will be used as a function facility ancillary to the existing education, training and community uses of the James O’Keeffe Institute/IRD campus. The works will be carried out within the curtilage of Newmarket House which is included on the Record of Protected Structures (where it is referred to as ‘James O’Keeffe Memorial Institute (Newmarket House)’, RPS No. 00162).
The construction of a single storey extension to the side and rear of dwelling and all ancillary works
Construction of an extension to rear of dwelling and all associated site works.
Permission for Retention of single storey extension (incorporating domestic garage, utility room, toilet and domestic store) to side of dwelling and vehicular entrance driveway to front of dwelling.
Permission to construct 22 dwellings comprising of 11 pairs of semi-detached units, complete with access roads, utilities and all associated site works
Permission to retain as constructed vehicular domestic entrance
The brief summarizes the pattern across all 145 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/6853The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief