9% of nearby decided applications were refused. The site check found 666 decisions within 5 km, 11 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.
The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref. 18/6874), from 40 no. days per annum to 60 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.
Permission for provision of covered storage shed over existing aggregate storage bays within the existing quarry site. The shed will be c.917.7m2 with a maximum ridge height of c.11.8m
The development will consist of the installation of a readymix concrete batching plant, ground limestone processing plant, ground limestone storage building (c. 240 m2), closed circuit settlement system and all ancillary works, within an application area of c. 0.85 hectares at the existing quarry landholding.
The brief summarizes the pattern across all 666 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6874The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief