Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 139 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) Retention of straw bedded shed (b) retention of silage pit (c) retention of underground slatted slurry tank and (d) construction of a livestock shed over existing underground slatted slurry tank and all associated siteworks.
To construct a dwellinghouse
(a) Retention of 6 no. first floor rooflights to existing dwelling and all associated elevation treatment, (b) Retention of existing waste water treatment system and percolation area and all associated site works and services. (c) Permission for the construction of a new domestic garage, a new landscaping scheme and all associated site works in accordance with plans and documents.
(1) The construction of a single storey dwelling, (2) the dismantling of an erected modular dwelling / storage shed, (3) the construction of a garage / storage shed, (4) the installation of a wastewater treatment system and (5) all ancillary works.
Construct a new entrance and access road to lands for use by forestry and all associated site works
To construct a new entrance and access road to lands, for use by forestry and all associated site works
The brief summarizes the pattern across all 139 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6952The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief