Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Ballyarra Castlelyons Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Ballyarra Castlelyons Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The site check found 270 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.

Matched source
18/6992
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

270Nearby applications
1Site-linked candidates
7%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

18/6992

Agricultural entrance and all ancillary work

Granted0.0 km01 April 2019
21/7322

Construction of new vehicular entrance, replacement of existing septic tank and soak pit with new wastewater treatment system and percolation area to existing dwelling house and all ancillary works.

Granted0.2 km14 February 2022
24/5507

Permission for extension and alterations of existing two storey house. The works will include; 1) Demolition of existing rear extension, sheds, and attached stables to the side of the house, 2) Construction of new single storey extensions to the side (West) and rear (North) of the house, 3)Internal alterations to the existing layout, 4) Elevational changes to existing house, including new and altered window openings to the side and rear, 5) Alterations to previously granted waste water treatment system, 6) and all other ancillary site works

Granted0.2 km21 January 2025
22/5086

Reconfigure existing front boundary, carparking area and yard space to provide new car parking (35 no. spaces) and defined access route to agri-yard, provide 2 no. additional garden-centre polytunnel bays adjacent to existing polytunnels, along with all other associated site & development works.

Granted0.2 km07 September 2022
25/4141

Permission to construct a single storey extension to the rear of the existing dwelling house, demolition of existing shed directly adjacent the existing house, alterations to existing elevations,installation of a new waste water treatment system and percolation area and all associated site works

Granted0.2 km14 October 2025
21/6717

(1) To demolish the existing dwelling house and decommission and remove the existing waste water treatment system, (2) To construct a new dwelling house with separate attached dwelling unit, (3) To construct a detached domestic garage along with all associated site development works including the installation of a new waste water treatment system.

Granted0.3 km27 April 2022

The brief summarizes the pattern across all 270 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required