Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 430 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for a development to be constructed in two phases. The development will consist of the construction of a new three storey extension (with rooftop plant and equipment), containing laboratories and office accommodation, extension to the canteen facilities, and all associated site works, carparking and road network.
The development will consist of the provision of an internally illuminated totem sign with a total height of 9.087 metres including a base pole of 6 metres and signage with a maximum height of 3.087 metres.
Permission for A high-power electric vehicle charging hub and associated infrastructure consisting of the following: 1) installation of 10 no. electric vehicle charging with 5 no. associated charging units to replace 12 no. existing car parking spaces, 2) installation of a new canopy above EV charging spaces with internally illuminated signage, 3) new EV banner sign, 4) relocation of existing lighting columns and electrical cabinet, 5) installation of a new ESB substation and 6) all other associated site development, landscaping, road tie in and surface water drainage works
Construction of a warehouse building and all associated site works including services and ancillary accommodation.
Permission for the construction of a high-power electric vehicle charging station consisting of 24 no. electric vehicle charging bays and all associated ancillary development including 2 no. electricity sub-stations, 24 no. power supply cabinets, pedestrian access, boundary treatments, landscaping and seating area at the Circle K service station. Vehicular access will be via the existing access and roundabout serving the existing Circle K motorway station. A Natura Impact Statement has been submitted to the planning authority with the application.
Retention of 1 no. car wash plant room and permission for the construction of 1 no. car wash and associated structures, the erection of 7 no. signs and 10 no. flagpoles and all associated ancillary development at the existing Motorway Service Area previously permitted under Cork County Council Ref. 14/6188 (An Bord Pleanala Ref. PL 04.244411)
The brief summarizes the pattern across all 430 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/7004The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief